Creating an Assignment Using Compact Form

BigTime Foresight offers two assignment form types to better fit different planning needs:

Form Type Best For Key Features
Standard Form Detailed, long-term planning Full control over time, billing, labels, notes, and more
Compact Form Quick, short-term scheduling Fewer fields, smart auto-calculations, streamlined experience

Use the Compact Form when:

  • You need to assign work quickly.
  • You’re doing short-term or high-volume scheduling.
  • You prefer fewer fields and faster input.

Use the Standard Form when:

  • You need advanced utilization settings and detailed financial metrics such as Total Income or Total Cost.
  • You want full control over every aspect of the assignment.
  • You are managing longer or more complex projects.

Follow these steps to quickly create an assignment using the Compact Form:

1. Click the Create Assignment icon.

2. Use the toggle at the top of the form to switch to the Compact Form.

3. Choose your planning method:

  • Capacity – Plan using a percentage (%) of the staffer’s total capacity.
  • Time per Day – Plan a specific number of hours per day.

If you’re planning by % of capacity, you can skip the Total Time field—it will be calculated automatically for you.

4. Fill in the key scheduling fields:

  • Total Time (Hours)
  • Total Duration (Days)
  • Start Date and Due Date

You can start with any field—BigTime will automatically adjust the others based on what you enter.

5. Set the assignment status: Choose between Active, Reserved, or Draft.

6. Select the Task/Deliverable/Phase name from the predefined list.

Note: This field name depends on your Lexicon settings in BigTime. To customize naming conventions (e.g., “Task” vs. “Deliverable”), follow the steps below: 

 

Close Resource Management ➡ Click My Company Tab when you're in BigTime ➡ Click My Company section on the menu ribbon ➡ Go to the Lexicon section

 

Learn more in: Your Company's Lexicon and Synchronizing Lexicon Settings in Foresight

The list of available tasks comes from the Project List setup in BigTime. 

Go to the following instructions to learn more about tasks in BigTime: Using Tasks in BigTime and Task-Based Resourcing in BigTime Foresight

7. Configure financial settings - Select the Staffer’s Bill Rate.

8. Define if the assignment is:

9. (Optional) Add a Label — it will appear as a tag on the assignment tile, such as in calendars.

10. Click Apply and Close to finish.